Construction Information
Subsidiary materials
Fixed stud – T bar


① Fix the T-bar using an air tacker

② Bend one wing to fix the insulation material

③ Arrange the insulation materials to all be connected

④ Bend the other wing to fix the insulation material

⑤ Finish with insulation tape
Fixed stud – plastic stud

※ Plastic fixture consisting of body and cap

① Fix the body using an air tacker

② Fix by attaching the cap after arranging the insulation materials to all be connected

③ Construction complete